BWA Architecture performed a comprehensive investigation of the three-story Courthouse building to identify existing deficiencies and propose building improvements. Subsequent design and construction modifications included utilities upgrades featuring a new HVAC system, a new mechanical hot water energy-efficient boiler system, new dedicated digital control systems, select wall and floor finish upgrades, life safety improvements, and fire protection. In order to bring the building up to MAAB compliance, BWA designed a new attractive light-filled, steel-frame addition to the building that now serves as the main accessible entrance to the courthouse.

Key Facts

PROJECT TYPE
Building Addition, Upgrades & New Construction Design

COMPLETION DATE
2009

PROJECT AREA
33,000 sf

CONSTRUCTION COST
$1.9M

GET IN TOUCH

We embrace the challenge of designing for optimal form and function within each project’s own budget and timeline. Tell us about your needs and goals. Connect with us by calling our office or completing our contact form.

bottom of page